Hedke Preparing for Construction

    1. The construction trailer for site workers is in place.
    2. Traffic along Marian continues as normal.
    3. Fencing lines the south side of the parking lot.
    4. The egress is maintained for student pick-up and drop-off.
    5. The playground remains open to students.
    6. The fencing runs east of the baseball diamond to the west side of the playground.
    7. The back walk is open.
    8. The kidergarten area will be enclosed in preparation for new construction.
    9. Kindergarten students will continue to exit through the front door.